Sid and I have a bet that the bathroom probably won't be completed before the month is over. We made the bet the first part of the month. It is looking like it might not occur. However this week proved more promising. The window was installed so he could finish with the tile installation and sheet rocking. Then he had to grout the floor and the tub. The vanity arrived on Friday and the toilet. However the there a lot of little things left to do and that is what worries me. Sid tried to do the painting, but we had to hire Diane Jackson to come and clean it up. All and all it looks really great.
Sunday, February 22, 2009
Sunday, February 8, 2009
Bathroom Remodeling
These photos are backwards. This is the new tub installed.
This is the demolition of the old tub.
This is the demolition of the old tub.
Bathroom completed gutted out.
It's hard to believe that we are doing some home maintenance. The girls convinced Sid that we needed to fix the bathroom. Wade Parker is doing the work and it has been a slow process. He completely gutted the room down to the studs. You can see how the process is going.
Subscribe to:
Posts (Atom)